3625 Peterson Way Office Development
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
demolition of existing structures and construction of (2) 8-story structural steel framed office buildings connected by bridges on two levels - 4 level concrete parking garage with 1 story amenities facility with fitness center/conference center/cafe
- Status
- Failure
- Sector
- Commercial, Bridge, Cement, Consumer Products, Residential, Steel, Car parking, Automotive, Metal, Raw Materials
- Location
- Santa Clara, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 3625 Peterson Way Office Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Delayed |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | demolition of existing structures and construction of (2) 8-story structural steel framed office buildings connected by bridges on two levels - 4 level concrete parking garage with 1 story amenities facility with fitness center/conference center/cafe |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Santa Clara |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Bridge, Cement, Consumer Products, Residential, Steel, Car parking, Automotive, Metal, Raw Materials |
Article published date | 2024-07-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
