logo

375 MLD Jebel Ali Sewage Treatment Plant

Sector: Commercial • Location: United Arab Emirates

Source: Larsen & Toubro

Project
Completed

UAE’s largest, state-of-the-art Sewage Treatment Plant (STP) at Jebel Ali (Phase 2) was engineered by us for the Dubai Municipality through which 375,000 cum/day litres of wastewater can be treated and reused for non-potable applications across Dubai. Built on a Build, Test, Commission, Operate & Maintain mode, the STP features Primary, Secondary and Tertiary Treatment process involving 2,650 proc

Project Information FAQ

Project Information

4 Q
The project “375 MLD Jebel Ali Sewage Treatment Plant” is an infrastructure initiative in the Commercial sector, located in United Arab Emirates. Taiyo aggregates data on it from Larsen & Toubro.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

UAE’s largest, state-of-the-art Sewage Treatment Plant (STP) at Jebel Ali (Phase 2) was engineered by us for the Dubai Municipality through which 375,000 cum/day litres of wastewater can be treated and reused for non-potable applications across Dubai. Built on a Build, Test, Commission, Operate & Maintain mode, the STP features Primary, Secondary and Tertiary Treatment process involving 2,650 process and mechanical equipment, 700 km of cables and 30 km of plant piping networks.  The Sludge Treatment Process includes Sludge Thickening (Rotary Drums & Belt Thickeners), Anaerobic Digestion, Dewatering (Centrifuge), Sludge Drying (Thermal paddle dryers) facilities and the Robotic Bagging System. Other scope of works included odour control facilities, Phase 1 STP interconnection, upgrading works in Phase 1, effluent pump stations, effluent reservoirs and biological reactors. Constructed in 670 hectares of dessert area, this project was delivered ahead of its schedule.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data