380 kV T-155 Gas-Insulated Substations for Hydrogen Plant
The status, timeline and source of this project. A free account opens every field.
Source: Fortune Business Insights
Contract awarded to GE Vernova’s Grid Solutions by Larsen & Toubro for supplying 380 kV T-155 gas-insulated substations for the largest utility-scale hydrogen plant at Oxagon mega plant, including photovoltaic and wind plants producing captive power.
- Status
- Closed
- Sector
- Solar, Wind, Hydrogen, Power Generation (CCGT), Power Transmission
- Location
- Saudi Arabia
- Updated
- 22 Jul 2026
- Source
- Fortune Business Insights
ConstructChat
Ask ConstructChat about 380 kV T-155 Gas-Insulated Substations for Hydrogen Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Contract awarded to GE Vernova’s Grid Solutions by Larsen & Toubro for supplying 380 kV T-155 gas-insulated substations for the largest utility-scale hydrogen plant at Oxagon mega plant, including photovoltaic and wind plants producing captive power. |
Original sector | Energy & Power |
Location
Country | Saudi Arabia |
Source
Source | Fortune Business Insights |
URL |
More Details
Record type | Project |
Sector | Solar, Wind, Hydrogen, Power Generation (CCGT), Power Transmission |
Article published date | 2026-07-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
