logo

3A Effluent Transmission Main Replacement Phase VIII

Sector: Water Supply and Storage • Location: San Juan Capistrano, California, United States of America

Source: Dodge

Project
Pre-Design

Replacement of the existing 20-inch diameter ETM pipeline with a new 30-inch diameter pipeline along the San Juan and Trabuco Creek Channel Levees.

Status
Prospective
Sector
Water Supply and Storage, Government, Consumer Products, Waste Processing and Treatment, Commercial
Location
San Juan Capistrano, California, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about 3A Effluent Transmission Main Replacement Phase VIII

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “3A Effluent Transmission Main Replacement Phase VIII” is an infrastructure initiative in the Water Supply and Storage sector, located in San Juan Capistrano, California, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Replacement of the existing 20-inch diameter ETM pipeline with a new 30-inch diameter pipeline along the San Juan and Trabuco Creek Channel Levees.

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

San Juan Capistrano

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Consumer Products, Waste Processing and Treatment, Commercial

Article published date

2025-03-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project