3D Printer Room Upgrade
Closed · Ohio · Last reported Mar 2024
Source: Dodge USA
The 121st MXG has purchased a new 3-dimensional printer system. This project will provide a new double-door access opening to the printer Room, 220-Volt, Single Phase, 50 Amp power for the printer, including and RCD Outlet connection and UPS/Battery backup capability, supplemental lighting for the room, and exhaust system for the printer. All work is to be complete prior to the arrival of the Prin
- Status
- Closed
- Sector
- Energy Storage, Power Generation (CCGT), Government, Commercial, Manufacturing (Industrial)
- Location
- Columbus, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 3D Printer Room Upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The 121st MXG has purchased a new 3-dimensional printer system. This project will provide a new double-door access opening to the printer Room, 220-Volt, Single Phase, 50 Amp power for the printer, including and RCD Outlet connection and UPS/Battery backup capability, supplemental lighting for the room, and exhaust system for the printer. All work is to be complete prior to the arrival of the Printer Unit in April, 2024. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Columbus |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Power Generation (CCGT), Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-03-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Energy Storage projects in United States of America
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 14 KW 35 MODULES AND 1 BATTERY 13.5 KWH ESS
- INSTALL (141) TESLA SOLAR ROOF TILES AT 10.152 KW TOTAL. INS TALL (13.5) KWH ENERGY STORAGE SYSTEM AND (N) LOAD CENTER
- 10' SUSPENDED WIRE PERIMETER SECRURITY SYSTEM INSIDE FENCE, BATTERY OPERATED LOW VOLTAGE
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 4.32 KW 12 MODULES AND INSTALL BACK-UP BATTERY 10.5 KWH, EQUIP. ON ENGINEERED FENCE
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 4.2 KW 12 MODULES 1 LG CHEM BATTERY 9.5 KWH
- REMOVE & REPLACE ANTENNAS, RRUS, BATTERY UNIT
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 10.8 KW 27 PANELS 1 NEW TESLA BATTERY NEW 100 AMP SOLAR PANEL
- PHASE 3-DATA CENTER- ENCOMPASSING OF PART OF 3RD FLOOR AHU ELECTRICAL ROOM,BATTERY ROOM,INSALL GENERATORS&EQUIP IN YARD
