logo

3iPowergen

Sector: Wind • Location: Philippines

Source: World Bank Group

Project
Active

3iPowergen operated three hybrid wind-diesel power plants in the island of Marinduque, Tablas, and Romblon of the Phillipines. These power plants supplied electricity for the three (3) islands electric cooperatives: Marinduque Electric Cooperative, Inc. (MARELCO), Tablas Island Electric Cooperative, Inc. (TIELCO) and Romblon Electric Cooperative, Inc. (ROMELCO) for a period of 15 years. The locati

Project Information FAQ

Project Information

4 Q
The project “3iPowergen” is an infrastructure initiative in the Wind sector, located in Philippines. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

3iPowergen operated three hybrid wind-diesel power plants in the island of Marinduque, Tablas, and Romblon of the Phillipines. These power plants supplied electricity for the three (3) islands electric cooperatives: Marinduque Electric Cooperative, Inc. (MARELCO), Tablas Island Electric Cooperative, Inc. (TIELCO) and Romblon Electric Cooperative, Inc. (ROMELCO) for a period of 15 years. The location of three power plant are at Bgy. Balogo, Sta Cruz, Marinduque, at Bgy. Cajimos, Romblon, Romblon, and at Bgy. Tubigon, Ferrol, Tablas Island. The capacities of the three power plants were to be 15.7-MW, 4.2 MW, and 10.6 MW, respectively. In September 2005, 3iPowergen Inc., won a competitive bid to supply power to the Philippine islands of Marinduque, Romblon, and Tablas. The power supply agreement (PSA) was signed on September 2005. 3iPowergen was a subsidiary of Coastal Power Development Corporation (CPDC). All three power plants was expected be operational on February 2007. The total estimated costs were to be Peso 1.4 billion or USD 24.8 million (calculated using average exchange rate of Peso/US$ for 2006 which was US$1= Peso 51). The plant was scheduled to replace the old aging bunker fuel oil-fired power plant in located in three islands. In August 2006, the Government of Phillipines granted 3i Powergen a package of tax breaks under the government's initiative for the 3 projects.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data