3rd Court Safety Improvements
Sector: Water Supply and Storage • Location: Issaquah, Washington, United States of America
Source: Dodge USA
The Work to be performed. provides for the improvement of pedestrian access at 3rd Court NW, including, but not limited to, temporary erosion control, sawc ut-ting, roadway excavation, removal of pavement, and sidewalk, installation of cement concrete side-walk, curb and gutter, pavement restoration, asphalt overlay utility trenching, adjustment of existing utilities, installation of stormwa-ter d
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Road, Government, Car parking, Cement, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT), Automotive
- Location
- Issaquah, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 3rd Court Safety Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work to be performed. provides for the improvement of pedestrian access at 3rd Court NW, including, but not limited to, temporary erosion control, sawc ut-ting, roadway excavation, removal of pavement, and sidewalk, installation of cement concrete side-walk, curb and gutter, pavement restoration, asphalt overlay utility trenching, adjustment of existing utilities, installation of stormwa-ter drainage drainage systems, property restoration, landscaping, and irri-gation |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Issaquah |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Road, Government, Car parking, Cement, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT), Automotive |
Article published date | 2024-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
