3rd Floor Renovation Employment Security Central Office (DOLIR)
Sector: Commercial • Location: Missouri, United States of America (USA)
Source: Office of administration, Missouri
The Project consists of the renovation of the office spaces on the 3rd floor of the Employment Security Central Office Building, including: selective demolition, interior partition construction, carpet and resilient flooring, interior door and frame installation, finish carpentry, interior painting, acoustical ceiling system modification, plumbing, electrical and rough-in work for communication/da
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | bidding closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Project consists of the renovation of the office spaces on the 3rd floor of the Employment Security Central Office Building, including: selective demolition, interior partition construction, carpet and resilient flooring, interior door and frame installation, finish carpentry, interior painting, acoustical ceiling system modification, plumbing, electrical and rough-in work for communication/data wiring. There are three alternates listed below: Alternate 1: Provide Formica 3466-RD Antique Mascarello Radiance® finish plastic laminate (or approved equal) for plastic laminated countertops in lieu of Formica 3466-11 Antique Mascarello SatinTouch™ finish plastic laminate. Alternate 2: Install pre-finished storefront glazing system (fixed windows) in interior partition between two conference rooms and large multi-purpose room (as shown on plans) in lieu of complete interior partition. Alternate 3: Install electrical duplex outlet and rough-in work for communication/data wiring at alternative location in two adjacent conference rooms. Alternate 4: Install hollow metal frame and double hollow metal doors – and associated hardware – at Multi-Purpose room in lieu of cased opening. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
