logo
ProjectPlanned

3rd Phase Lead Service Line Replacement

Sector: Water Supply and Storage • Location: Forest Park, Illinois, United States

Source: Forest Park Review

The third phase of the village-wide lead service line replacement project involves replacing lead pipes running from the Buffalo Box valve at the parkway to 18 inches inside buildings with copper pipes. This phase covers the 400, 500, and 600 blocks of Hannah, Thomas, and Beloit in Forest Park, Illinois. The project includes engineering services for coordination, pre-construction, construction obs

Status
Prospective
Sector
Water Supply and Storage, Metal, Road, Government
Location
Forest Park, Illinois, United States of America
Updated
22 Jul 2026
Source
Forest Park Review

ConstructChat

Ask ConstructChat about 3rd Phase Lead Service Line Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “3rd Phase Lead Service Line Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Forest Park, Illinois, United States. Taiyo aggregates data on it from Forest Park Review.

Participants

Sponsoring Agency

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The third phase of the village-wide lead service line replacement project involves replacing lead pipes running from the Buffalo Box valve at the parkway to 18 inches inside buildings with copper pipes. This phase covers the 400, 500, and 600 blocks of Hannah, Thomas, and Beloit in Forest Park, Illinois. The project includes engineering services for coordination, pre-construction, construction observation, and post-construction.

Original sector

Water Infrastructure

Budget

Location

Country

United States of America (USA)

State

Illinois

City

Forest Park

Source

Source

Forest Park Review

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Metal, Road, Government

Article published date

2025-12-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project