3RD TROMBAY POWER PR
Sector: Power Generation (CCGT) • Location: India
Source: World Bank Group
In order to help meet the forecast load growth in the Bombay area, the project provides for construction at Trombay of a 500 MW power generating unit, together with boiler, electrical and mechanical equipment and associated works. This is the first single unit installation of this size to be constructed in India and the principal project risks concern problems during the erection, commissioning an
- Status
- Closed
- Sector
- Power Generation (CCGT), Geothermal, Government
- Location
- India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about 3RD TROMBAY POWER PR
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In order to help meet the forecast load growth in the Bombay area, the project provides for construction at Trombay of a 500 MW power generating unit, together with boiler, electrical and mechanical equipment and associated works. This is the first single unit installation of this size to be constructed in India and the principal project risks concern problems during the erection, commissioning and initial operational stages. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | India |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Geothermal, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
