4-Lane Flyover Construction at Shaheed Path Intersection over Gomti River
Sector: Bridge • Location: Lucknow, Uttar Pradesh, India
Source: Trade Brains
Construction of a 4-lane flyover with two loops and two ramps at the Shaheed Path intersection over the RHS bank of the Gomti River in Lucknow, Uttar Pradesh. The project is awarded on an EPC basis and is expected to be completed within 24 months.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | awarded |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Construction of a 4-lane flyover with two loops and two ramps at the Shaheed Path intersection over the RHS bank of the Gomti River in Lucknow, Uttar Pradesh. The project is awarded on an EPC basis and is expected to be completed within 24 months. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Bridge projects in India
- Supreme Panvel Indapur Tollways Private Limited
- Howrah Bridge
- Chenani-Nashri Tunnel (Patnitop Tunnel), India
- Chennai Outer Ring Road (ORR), Tamil Nadu, India
- Nagpur City Ring Road Package I
- Kochi LNG Terminal
- Construction of New Link (NH-133B) from Km. 0.000 (Km. 200.87 of Sahibganj Bypass) in Jharkhand to Km. 15.885 (Junction of NH-133B and 131A on Manihanri Bypass) and construction of Manihari Bypass from Km. 0.000 (Junction of NH-133B and 131A on Manihari Bypass) to Km. 6.000 near Naranpur of NH-131A in the State of Bihar including 4 Lane Ganga Bridge on Hybrid Annuity Mode under NH(0) funding (Package I)
- Four laning of Barhi to Hazaribagh section of NH 33 in Jharkhand
