4-Lane Flyover Construction at Shaheed Path Intersection over Gomti River
Awarded · Uttar Pradesh · Last reported May 2026
Source: Trade Brains
Construction of a 4-lane flyover with two loops and two ramps at the Shaheed Path intersection over the RHS bank of the Gomti River in Lucknow, Uttar Pradesh. The project is awarded on an EPC basis and is expected to be completed within 24 months.
- Status
- Closed
- Sector
- Bridge, Road
- Location
- Lucknow, Uttar Pradesh, India
- Updated
- 22 Jul 2026
- Source
- Trade Brains
ConstructChat
Ask ConstructChat about 4-Lane Flyover Construction at Shaheed Path Intersection over Gomti River
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of a 4-lane flyover with two loops and two ramps at the Shaheed Path intersection over the RHS bank of the Gomti River in Lucknow, Uttar Pradesh. The project is awarded on an EPC basis and is expected to be completed within 24 months. |
Original sector | Road Infrastructure |
Budget |
Location
Country | India |
State | Uttar Pradesh |
City | Lucknow |
Source
Source | Trade Brains |
URL |
More Details
Record type | Project |
Sector | Bridge, Road |
Article published date | 2026-05-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
