4-laning of highway section from Byrapura to Challakere
Sector: Road • Location: India
Source: World Bank Group
NHAI has granted DBCHPL a 17-year concession (including construction period of 730 days) for the four laning of 49.95km of Byrapura to Challakere section of NH-150A in Karnataka on a design, build, operate and transfer basis under Bharatmala Pariyojana on HAM. NHAI shall pay a lump sum amount, linked to inflation, to DBCHPL in the form of 30 semi-annual annuities after the achievement of commercia
- Status
- Prospective
- Sector
- Road, Commercial, Government
- Location
- India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about 4-laning of highway section from Byrapura to Challakere
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | NHAI has granted DBCHPL a 17-year concession (including construction period of 730 days) for the four laning of 49.95km of Byrapura to Challakere section of NH-150A in Karnataka on a design, build, operate and transfer basis under Bharatmala Pariyojana on HAM. NHAI shall pay a lump sum amount, linked to inflation, to DBCHPL in the form of 30 semi-annual annuities after the achievement of commercial operation date (COD). The estimated project cost is INR6,708 million, which is to be funded by an estimated payment of INR3,325 million from NHAI, a rupee term loan of INR2,571 million and promoter’s contribution of INR812 million. DWBHPL is 100% owned by Dilip Buildcon Limited. Financial close took place on August 31, 2018. https://www.indiaratings.co.in/PressRelease?pressReleaseID=33502&title=India-Ratings-Assigns-DBL-Byrapura-Challakere%E2%80%99s-Proposed-Bank-Loans-%E2%80%98Provisional-IND-A%E2%80%99%2FStable WB files |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | India |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Commercial, Government |
Article published date | 2024-09-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in India
- Dholera Solar Park Gujarat
- Sugen 1100MW CCGT Akhakhol Gujarat
- ONGC Tripura Power Plant
- Cable-stayed bridge project in the Chambal River
- Mumbra Bypass Project
- Essel Gwalior Shivpuri Toll Roads Private Limited
- RattanIndia Power Limited (Amravati Thermal Power Project)
- GVRMP Belgaum Khanapur Tollway Private Limited
