4 MW Captive Solar Plant EPC Project
Sector: Solar • Location: India
Source: Power Peak Digest
GRE Renew Enertech Limited secured a Rs 12.95 crore EPC contract from Ajita Sil-Chem Private Limited for a 4,032 kW DC (3,000 kW AC) captive solar plant. The project will be executed on a turnkey basis and completed within about six months. The order was received on March 25, 2026.
- Status
- Closed
- Sector
- Solar, Power Generation (CCGT)
- Location
- India
- Updated
- 22 Jul 2026
- Source
- Power Peak Digest
ConstructChat
Ask ConstructChat about 4 MW Captive Solar Plant EPC Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | GRE Renew Enertech Limited secured a Rs 12.95 crore EPC contract from Ajita Sil-Chem Private Limited for a 4,032 kW DC (3,000 kW AC) captive solar plant. The project will be executed on a turnkey basis and completed within about six months. The order was received on March 25, 2026. |
Original sector | Power |
Budget |
Location
Country | India |
Source
Source | Power Peak Digest |
URL |
More Details
Record type | Project |
Sector | Solar, Power Generation (CCGT) |
Article published date | 2026-03-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
