logo

4 Partial Schools Roof Replacements

Sector: Commercial • Location: Prince Edward Island, Canada

Source: Infrastructure Canada

Project
Completed

This project consists of roof retrofit work required immediately at the Provincially owned LM Montgomery, East Wiltshire, ME Callaghan and Somerset Elementary to ensure a tight building envelope and protect these aging existing assets. This project is targeted at the priority roof areas that have failed and require immediate attention. The total area of roof repair is approximately 37,880 SF ($630

Project Information FAQ

Project Information

5 Q
The project “4 Partial Schools Roof Replacements” is an infrastructure initiative in the Commercial sector, located in Prince Edward Island, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project consists of roof retrofit work required immediately at the Provincially owned LM Montgomery, East Wiltshire, ME Callaghan and Somerset Elementary to ensure a tight building envelope and protect these aging existing assets. This project is targeted at the priority roof areas that have failed and require immediate attention. The total area of roof repair is approximately 37,880 SF ($630,000). This area is broken down by each school as follows: LM Montgomery (11,500 SF, $180,000), East Wiltshire (7,640 SF, $130,000), ME Callaghan (6,240 SF, $120,000), Somerset Elementary (12,500 SF, $200,000). The Province of PEI endeavors to increase roof insulation where practical on all school roofing projects to R40, in line with NECB 2017. The new roofing system will be of conventional modified bitumen construction allowing for increased insulation. This project will have direct impacts on improving the energy efficiency of all four schools by lowering heating and cooling costs with tighter building envelopes. All of these roof areas identified are over 30 years old and at the end of their useful life. They are all Inverted Roofing Membrane Assembly ballasted type roofs that provide ample environmental protection but are notoriously difficult from a facilities maintenance perspective to source leaks. While recurring maintenance programs have extended the life of these assets it is time for replacement as they leak frequently and the effectiveness of the minimal insulation is suspect. This project will further promote the economic recovery plan by spurring construction in rural PEI.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data