logo
ProjectAbandoned

40 MW Solar Farm

Abandoned · Wyoming · Last reported Nov 2024

Source: Dodge USA

Plans to install tens of thousands of solar panels across 93.5 acres of remote, privately-owned land - Consists of two separate 20-megawatt solar photovoltaic facilities that will be constructed at the same time with approximately 156,000 panels between them

Status
Failure
Sector
Solar, Commercial, Car parking, Automotive, Power Generation (CCGT), Raw Materials
Location
Frannie, Wyoming, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about 40 MW Solar Farm

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “40 MW Solar Farm” is an infrastructure initiative in the Solar sector, located in Frannie, Wyoming, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Abandoned

Taiyo status

Failure

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Plans to install tens of thousands of solar panels across 93.5 acres of remote, privately-owned land - Consists of two separate 20-megawatt solar photovoltaic facilities that will be constructed at the same time with approximately 156,000 panels between them

Procurement method

Budget

Location

Country

United States of America (USA)

State

Wyoming

City

Frannie

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Solar, Commercial, Car parking, Automotive, Power Generation (CCGT), Raw Materials

Article published date

2024-11-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project