400 kV Inaruwa–Purnea and Dododhara–Bareilly Cross-Border Transmission Lines
The owner, status and timeline of this project. A free account opens every field.
Source: The Kathmandu Post
Agreement to move forward with the construction of the 400 kV Inaruwa–Purnea and Dododhara–Bareilly cross-border transmission lines under a joint investment framework through Special Purpose Vehicles (SPVs) in Nepal and India. Shareholders’ Agreement and Joint Venture Agreement have been signed between Nepal Electricity Authority and Power Grid Corporation of India Ltd.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Automotive
- Location
- Nepal
- Updated
- 22 Jul 2026
- Source
- The Kathmandu Post
ConstructChat
Ask ConstructChat about 400 kV Inaruwa–Purnea and Dododhara–Bareilly Cross-Border Transmission Lines
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Agreement to move forward with the construction of the 400 kV Inaruwa–Purnea and Dododhara–Bareilly cross-border transmission lines under a joint investment framework through Special Purpose Vehicles (SPVs) in Nepal and India. Shareholders’ Agreement and Joint Venture Agreement have been signed between Nepal Electricity Authority and Power Grid Corporation of India Ltd. |
Original sector | Energy |
Location
Country | Nepal |
Source
Source | The Kathmandu Post |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Automotive |
Article published date | 2026-07-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Nepal and India
- Chameliya–Jauljibi 220 kV Double-Circuit Transmission Line
- Motihari–Nijgadh 400 kV Double-Circuit Transmission Line
- Inaruwa-Purnea and Dododhara-Bareilly 400 kV Transmission Corridors
- Inaruwa-New Purnea and Lamki-Bareilly Cross-Border Power Transmission Projects
- New Butwal-Gorakhpur and Dhalkebar-Sitamarhi 400 kV Cross-border Transmission Lines
- New Butwal–Gorakhpur 400 kV Transmission Line Operation
- Inaruwa-Purnea and Dododhara-Bareilly 400 kV Transmission Projects
- Muzaffarpur–Dhalkebar 400 kV Transmission Line Reconductoring
