400 KV power transmission line ALB-MKD (Elbasan - Fier sub-line)

Sector: Commercial • Location: Albania

Source: KFW Bank aus Verantwortung

Project
Active

As part of the FC measure 400 kV power transmission line Albania - Macedonia, a third cross-border power transmission line is to be built in Albania, thus closing the last gap in the transmission network with its neighboring countries. The planned investments are of great regional importance, as the planned power transmission line is an important building block in the regional network and an impor

Project Information FAQ

Project Information

5 Q
The project “400 KV power transmission line ALB-MKD (Elbasan - Fier sub-line)” is an infrastructure initiative in the Commercial sector, located in Albania. Taiyo aggregates data on it from KFW Bank aus Verantwortung.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

As part of the FC measure 400 kV power transmission line Albania - Macedonia, a third cross-border power transmission line is to be built in Albania, thus closing the last gap in the transmission network with its neighboring countries. The planned investments are of great regional importance, as the planned power transmission line is an important building block in the regional network and an important prerequisite for regional electricity exchange. In addition, the new line will help improve the security and quality of supply in the power transmission system in Albania and the region. The beneficiaries of the project are therefore all consumers connected to the Albanian power grid. The program will build two sub-lines (i) the Elbasan - Fier transmission line and (ii) the Elbasan - Qafe Thane transmission line. In addition, the new construction of the 400/220 kV Elbasan 3 switchgear and the rehabilitation of the 400/220 kV Fier switchgear are planned. The section of the line on the Macedonian side will be constructed in a complementary manner by the Macedonian electricity transmission company MEPSO and financed by a loan from the EBRD. The borrower and program sponsor is the Albanian electricity transmission company Operatori i Sistemit te Transmetimit (OST sh.a.). The program is to be financed primarily by development loans of up to EUR 50.0 million and an investment grant from the WBIF of EUR 14.0 million. The sponsor OST's own contribution will amount to EUR 5 million.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data