400 MW Hybrid with BESS Project
Sector: Solar • Location: Hyderabad, Andhra Pradesh, India
Source: Saur Energy International
Axis Energy has received approval from the Andhra Pradesh Electricity Regulatory Commission for a 400 MW hybrid project that combines solar and wind energy with battery energy storage systems. This project is part of a larger initiative to develop 10,000 MW of renewable energy in Andhra Pradesh, which includes both wind and solar components.
- Status
- Closed
- Sector
- Solar, Wind, Energy Storage, Power Generation (CCGT)
- Location
- Hyderabad, Andhra Pradesh, India
- Updated
- 22 Jul 2026
- Source
- Saur Energy International
ConstructChat
Ask ConstructChat about 400 MW Hybrid with BESS Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Axis Energy has received approval from the Andhra Pradesh Electricity Regulatory Commission for a 400 MW hybrid project that combines solar and wind energy with battery energy storage systems. This project is part of a larger initiative to develop 10,000 MW of renewable energy in Andhra Pradesh, which includes both wind and solar components. |
Original sector | Energy |
Location
Country | India |
State | Andhra Pradesh |
City | Hyderabad |
Source
Source | Saur Energy International |
URL |
More Details
Record type | Project |
Sector | Solar, Wind, Energy Storage, Power Generation (CCGT) |
Article published date | 2025-05-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
