logo

400 MW Solar EPC Project in Rajasthan

Sector: Power Transmission • Location: Rajasthan, India

Source: Saur Energy

Project
Awarded

Chandigarh-based HARTEK's Renewables Business Unit has secured a 400 MW utility-scale solar Engineering, Procurement and Construction (EPC) project in Rajasthan. The project will be executed in two phases comprising two solar power plants of 200 MW each, with a total installed capacity of 299.2MWac/400MWdc. The scope includes detailed engineering, procurement, installation, construction, testing,

Status
Closed
Sector
Power Transmission, Solar, Power Generation (CCGT)
Location
Rajasthan, India
Updated
22 Jul 2026
Source
Saur Energy

ConstructChat

Ask ConstructChat about 400 MW Solar EPC Project in Rajasthan

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “400 MW Solar EPC Project in Rajasthan” is an infrastructure initiative in the Power Transmission sector, located in Rajasthan, India. Taiyo aggregates data on it from Saur Energy.

Participants

Not available for this record.

Status

Original status

awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Chandigarh-based HARTEK's Renewables Business Unit has secured a 400 MW utility-scale solar Engineering, Procurement and Construction (EPC) project in Rajasthan. The project will be executed in two phases comprising two solar power plants of 200 MW each, with a total installed capacity of 299.2MWac/400MWdc. The scope includes detailed engineering, procurement, installation, construction, testing, commissioning of the solar photovoltaic plant, associated pooling substation, handling owner-supplied equipment, grid interconnection, and final project commissioning.

Original sector

Energy

Location

Country

India

State

Rajasthan

Source

Source

Saur Energy

URL

More Details

Record type

Project

Sector

Power Transmission, Solar, Power Generation (CCGT)

Article published date

2026-07-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project