400 MW Wind Power Projects
Sector: Solar • Location: India
Source: Mercom India
The Solar Energy Corporation of India (SECI) has invited bids to set up 400 MW of interstate transmission system (ISTS)-connected wind power projects under the build, own and operate model. Bids must be submitted by April 15, 2025, with the opening of bids scheduled for April 16, 2025.
- Status
- Prospective
- Sector
- Solar, Wind, Power Generation (CCGT), Road
- Location
- India
- Updated
- 22 Jul 2026
- Source
- Mercom India
ConstructChat
Ask ConstructChat about 400 MW Wind Power Projects
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Solar Energy Corporation of India (SECI) has invited bids to set up 400 MW of interstate transmission system (ISTS)-connected wind power projects under the build, own and operate model. Bids must be submitted by April 15, 2025, with the opening of bids scheduled for April 16, 2025. |
Original sector | Renewable Energy |
Location
Country | India |
Source
Source | Mercom India |
URL |
More Details
Record type | Project |
Sector | Solar, Wind, Power Generation (CCGT), Road |
Article published date | 2025-03-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
