400kV Double-Circuit Transmission Line
Sector: Energy • Location: Raipur, Chhattisgarh, India
Source: India Infoline
Bajel Projects Ltd has secured an EPC contract from Adani Energy Solutions Ltd for the construction of a 400kV double-circuit transmission line. The project spans 217 kilometers, connecting Raipur in Chhattisgarh to Tiroda in Maharashtra, and is expected to be completed within 18 months.
- Status
- Closed
- Sector
- Energy
- Location
- Raipur, Chhattisgarh, India
- Updated
- 22 Jul 2026
- Source
- India Infoline
ConstructChat
Ask ConstructChat about 400kV Double-Circuit Transmission Line
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Bajel Projects Ltd has secured an EPC contract from Adani Energy Solutions Ltd for the construction of a 400kV double-circuit transmission line. The project spans 217 kilometers, connecting Raipur in Chhattisgarh to Tiroda in Maharashtra, and is expected to be completed within 18 months. |
Original sector | Energy |
Location
Country | India |
State | Chhattisgarh |
City | Raipur |
Source
Source | India Infoline |
URL |
More Details
Record type | Project |
Article published date | 2025-01-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
