400KV HVDC Power Transmission Line
Sector: Government • Location: Bheramara, Bangladesh
Source: www.daily-sun.com
The first ever 400KV High Voltage Direct Current (HVDC) line has been established to import 500 MW power from Baharampur, India through Bheramara, Bangladesh Grid Interconnection. The 54.7 ckt-km 1113 MCM double circuit line was established in 2013 to transmit electricity by converting into high voltage DC from AC and then converted into 230kV AC at the Bheramara station.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The first ever 400KV High Voltage Direct Current (HVDC) line has been established to import 500 MW power from Baharampur, India through Bheramara, Bangladesh Grid Interconnection. The 54.7 ckt-km 1113 MCM double circuit line was established in 2013 to transmit electricity by converting into high voltage DC from AC and then converted into 230kV AC at the Bheramara station. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
