logo

4300 West Road Widening Project

Sector: Water Supply and Storage • Location: Roy, Utah, United States of America

Source: Dodge

Project
Closed

The work consists of approximately 3,000 feet of curb, gutter, and sidewalk along 4300 West and the extension of the asphalt pavement to the new curb and gutter with modifications to the storm drain.

Status
Closed
Sector
Water Supply and Storage, Government, Waste Processing and Treatment, Car parking, Road, Automotive, Commercial
Location
Roy, Utah, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about 4300 West Road Widening Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “4300 West Road Widening Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Roy, Utah, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The work consists of approximately 3,000 feet of curb, gutter, and sidewalk along 4300 West and the extension of the asphalt pavement to the new curb and gutter with modifications to the storm drain.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Utah

City

Roy

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Waste Processing and Treatment, Car parking, Road, Automotive, Commercial

Article published date

2025-04-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project