435 MW DC Ground-Mounted Solar Power Project
Sector: Solar • Location: India
Source: pv magazine India
Waaree Renewable Technologies has been awarded the engineering, procurement, and construction (EPC) contract for a 300 MW AC (435 MW DC) ground-mounted solar power project. The project is to be executed on a turnkey basis and is scheduled for completion in the financial year 2025-26.
- Status
- Closed
- Sector
- Solar, Power Generation (CCGT)
- Location
- India
- Updated
- 22 Jul 2026
- Source
- pv magazine India
ConstructChat
Ask ConstructChat about 435 MW DC Ground-Mounted Solar Power Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Waaree Renewable Technologies has been awarded the engineering, procurement, and construction (EPC) contract for a 300 MW AC (435 MW DC) ground-mounted solar power project. The project is to be executed on a turnkey basis and is scheduled for completion in the financial year 2025-26. |
Original sector | Energy |
Budget |
Location
Country | India |
Source
Source | pv magazine India |
URL |
More Details
Record type | Project |
Sector | Solar, Power Generation (CCGT) |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
