43rd Street Shared Street Pedestrian Safety MED-670 Impts
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
This project will implement a shared street on 43rd street between Lexington avenue and 3rd avenue. This entails the reconstruction of the entire block in order to achieve the desired pedestrian safety benefits. The project will also build out the two "top of the t" neckdowns next to Grand Central Terminal located along Lexington avenue at 43rd and 44th streets. This is one of the first project to
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government, Road, Commercial
- Location
- New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 43rd Street Shared Street Pedestrian Safety MED-670 Impts
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project will implement a shared street on 43rd street between Lexington avenue and 3rd avenue. This entails the reconstruction of the entire block in order to achieve the desired pedestrian safety benefits. The project will also build out the two "top of the t" neckdowns next to Grand Central Terminal located along Lexington avenue at 43rd and 44th streets. This is one of the first project to be built out as part of the new east midtown rezoning agreement/ |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | New York |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government, Road, Commercial |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
