logo

4.455 MW Rooftop Solar Projects Across India Under RESCO Model

Sector: Solar • Location: Bhopal, India

Source: SolarQuarter

Project
Planned

Solar Energy Corporation of India Limited (SECI) has announced a tender to select Solar Project Developers for setting up 4455 kW of grid-connected rooftop solar PV systems across multiple locations in India. These projects will be developed under the RESCO model, where developers invest in, build, and operate the systems while supplying power to the respective institutions. The projects will be i

Status
Prospective
Sector
Solar, Education, Power Generation (CCGT), Commercial, Residential
Location
Bhopal, India
Updated
22 Jul 2026
Source
SolarQuarter

ConstructChat

Ask ConstructChat about 4.455 MW Rooftop Solar Projects Across India Under RESCO Model

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “4.455 MW Rooftop Solar Projects Across India Under RESCO Model” is an infrastructure initiative in the Solar sector, located in Bhopal, India. Taiyo aggregates data on it from SolarQuarter.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Solar Energy Corporation of India Limited (SECI) has announced a tender to select Solar Project Developers for setting up 4455 kW of grid-connected rooftop solar PV systems across multiple locations in India. These projects will be developed under the RESCO model, where developers invest in, build, and operate the systems while supplying power to the respective institutions. The projects will be installed across 14 organizations and institutes, including campuses of Central Sanskrit University and the Regional Passport Office in Bhopal. The selected developers will follow a Build-Own-Operate (BOO) model, handling the full project lifecycle including design, engineering, procurement, installation, testing, commissioning, operation, and maintenance throughout the Power Purchase Agreement duration. The tender is technology-agnostic with performance benchmarks for Capacity Utilization Factor (CUF). Financial requirements include Earnest Money Deposit and Performance Bank Guarantee. The commissioning timeline is seven months for Category A projects and nine months for Category B projects from the PPA effective date.

Original sector

Energy

Location

Country

India

City

Bhopal

Source

Source

SolarQuarter

URL

More Details

Record type

Project

Sector

Solar, Education, Power Generation (CCGT), Commercial, Residential

Article published date

2026-04-13

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project