45 Q St SW Mixed Use Redevelopment
Sector: Steel • Location: Washington, District of Columbia, United States of America
Source: Dodge
Proposed hotel-residential-commercial development - The development to replace USA Motors, the auto repair shop, on the northwest corner of Half and Q Streets SW with 68 apartments including studios to 2-bedroom units, a 190-room hotel, and a roughly 3,700 square-foot market - 4,900 square-foot penthouse-level bar and rooftop residential amenities that include an indoor dog wash and an outdoor dog
- Status
- Failure
- Sector
- Steel, Hotel, Consumer Products, Residential, Manufacturing (Industrial), Car parking, Road, Automotive, Commercial
- Location
- Washington, District of Columbia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 45 Q St SW Mixed Use Redevelopment
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Delayed |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Proposed hotel-residential-commercial development - The development to replace USA Motors, the auto repair shop, on the northwest corner of Half and Q Streets SW with 68 apartments including studios to 2-bedroom units, a 190-room hotel, and a roughly 3,700 square-foot market - 4,900 square-foot penthouse-level bar and rooftop residential amenities that include an indoor dog wash and an outdoor dog run Both the market and the lobby of the hotel would have Nanawall folding garage-style doors to... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | District of Columbia |
City | Washington |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Steel, Hotel, Consumer Products, Residential, Manufacturing (Industrial), Car parking, Road, Automotive, Commercial |
Article published date | 2025-04-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- Pacific Visions Wing at the Aquarium of the Pacific
- WilmerHale Tenant Fit-Out
- UW Seismic Improvements
- DCA Terminal A Improvements
- Kansas City International Airport (MCI) New Single Terminal
