logo
ProjectPlanning Schematics

477 Mount Pleasant Mixed Use Development

Planning schematics · Ontario · Last reported Nov 2024

Source: Dodge

A proposed redevelopment of the site with a 12-storey mid-rise, mixed-use building with retail fronting Mount Pleasant Road. The proposal will include a total gross floor area (GFA) of 25,190 square metres, consisting of 24,110 square metres of residential GFA and 1,080 square metres of retail GFA, as well as a total of 367 new residential dwelling units, resulting in a density of 3.6 FSI.

Status
Prospective
Sector
Manufacturing (Industrial), Residential, Road, Commercial
Location
Toronto, Ontario, Canada
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about 477 Mount Pleasant Mixed Use Development

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “477 Mount Pleasant Mixed Use Development” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Toronto, Ontario, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

A proposed redevelopment of the site with a 12-storey mid-rise, mixed-use building with retail fronting Mount Pleasant Road. The proposal will include a total gross floor area (GFA) of 25,190 square metres, consisting of 24,110 square metres of residential GFA and 1,080 square metres of retail GFA, as well as a total of 367 new residential dwelling units, resulting in a density of 3.6 FSI.

Budget

Location

Country

Canada

State

Ontario

City

Toronto

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Residential, Road, Commercial

Article published date

2025-03-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project