logo

480MW Data Centre Campus in North Central Kentucky

Sector: Data Center • Location: Kentucky, United States

Source: Construction Briefing

Project
Planned

Fluor Corporation has signed an early works agreement with TeraWulf for a large-scale brownfield data center campus in North Central Kentucky, US. The project involves master planning and pre-construction services for a data center campus with access to up to 480 megawatts of grid-connected power. Fluor will lead the project from its North American Data Center Execution Hub in Greenville, South Ca

Status
Prospective
Sector
Data Center, Power Generation (CCGT)
Location
Kentucky, United States of America
Updated
22 Jul 2026
Source
Construction Briefing

ConstructChat

Ask ConstructChat about 480MW Data Centre Campus in North Central Kentucky

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “480MW Data Centre Campus in North Central Kentucky” is an infrastructure initiative in the Data Center sector, located in Kentucky, United States. Taiyo aggregates data on it from Construction Briefing.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Fluor Corporation has signed an early works agreement with TeraWulf for a large-scale brownfield data center campus in North Central Kentucky, US. The project involves master planning and pre-construction services for a data center campus with access to up to 480 megawatts of grid-connected power. Fluor will lead the project from its North American Data Center Execution Hub in Greenville, South Carolina, starting early engineering, master planning, and pre-construction activities while finalizing definitive engineering, procurement, and construction documentation.

Original sector

Data Center

Location

Country

United States of America (USA)

State

Kentucky

Source

Source

Construction Briefing

URL

More Details

Record type

Project

Sector

Data Center, Power Generation (CCGT)

Article published date

2026-03-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project