480V Double-Ended Station Service
Sector: Broadband • Location: Wrangell, Alaska, United States of America
Source: Dodge USA
to procure, install, and commission new 480V double-ended station service metal-clad rated switchgear, breakers, feeder, and subfeeder cables, fiber optic Arc Flash protected busbars, ARMS, Operations Manuals, and Training, ancillary equipment and all cables from the new equipment to the first point of termination for SEAPA's Tyee Lake Station Service Distribution System.The Tyee Lake Hydroelectri
- Status
- Closed
- Sector
- Broadband, Metal, Water Supply and Storage, Rail, Telecommunications, Commercial, Hydro
- Location
- Wrangell, Alaska, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 480V Double-Ended Station Service
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | to procure, install, and commission new 480V double-ended station service metal-clad rated switchgear, breakers, feeder, and subfeeder cables, fiber optic Arc Flash protected busbars, ARMS, Operations Manuals, and Training, ancillary equipment and all cables from the new equipment to the first point of termination for SEAPA's Tyee Lake Station Service Distribution System.The Tyee Lake Hydroelectric Project is located 40 miles southeast of Wrangell, Alaska at the head of Bradfield Canal. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alaska |
City | Wrangell |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Broadband, Metal, Water Supply and Storage, Rail, Telecommunications, Commercial, Hydro |
Article published date | 2024-03-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Broadband projects in United States of America
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- MODIFY EXISTING WIRELESS FACILITY, REMOVE (2) TMA'S, INSTALL (1) RRU , REMOVE (2) DIPLEXERS & UTILITY STANDS, REMOVE (2)
- TEMPORARY USE FOR TEMPORARY FACILITY - CELL SITE ON WHEELS (COW) FOR VERIZON WIRELESS - 67-FEET TALL
- DISH WIRELESS WILL BE PERFORMING A 1ST TIME INSTALL AT AN EX ISTING COMM FACILITY. ADDING 3 ANTENNA AND 6 RRU TO TOP OF T
