4/C Office Tower Residential Mixed Use
Planning schematics · Washington · Last reported Nov 2024
Source: Dodge USA
The tower was 100 stories but is now is 90, according to revised project information submitted to the city in October. The updated plan calls for 234 condos on floors 65 through 90 and 784 apartments on levels 11 through 61. The 62nd floor is marked as the apartment amenity space and the 63rd is planned as the amenity space for the condo. Retail space is planned for the first floor lobby area as w
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Commercial, Steel, Car parking, Automotive, Residential
- Location
- Seattle, Washington, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 4/C Office Tower Residential Mixed Use
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The tower was 100 stories but is now is 90, according to revised project information submitted to the city in October. The updated plan calls for 234 condos on floors 65 through 90 and 784 apartments on levels 11 through 61. The 62nd floor is marked as the apartment amenity space and the 63rd is planned as the amenity space for the condo. Retail space is planned for the first floor lobby area as well as a mezzanine on the second level, with parking on levels three through eight below a level ... |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Seattle |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Steel, Car parking, Automotive, Residential |
Article published date | 2024-11-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
