logo
ProjectCompleted

4th Line Trail Construction -Active Transportation

The status, timeline and source of this project. A free account opens every field.

Source: Infrastructure Canada

A 2.45 kilometre trail connecting the Village of Franktown with the Ottawa Valley Recreational Trail will be designed and constructed. The trail will be constructed with a 10 inch base of granular material and stone dust top with appropriate signage installed.

Status
Closed
Sector
Government
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about 4th Line Trail Construction -Active Transportation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “4th Line Trail Construction -Active Transportation” is an infrastructure initiative in the Government sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A 2.45 kilometre trail connecting the Village of Franktown with the Ottawa Valley Recreational Trail will be designed and constructed. The trail will be constructed with a 10 inch base of granular material and stone dust top with appropriate signage installed.

Original sector

Active Transportation

Budget

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Government

Article published date

2025-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project