4th Street Bridge Replacement Project
Sector: Road • Location: Covington, Kentucky, United States
Source: WCPO 9 News
The 4th Street Bridge replacement project is in the final design phase with plans expected by December. Construction is scheduled to start in January, which will include demolition of the existing bridge.
- Status
- Prospective
- Sector
- Road, Water Supply and Storage, Bridge, Government
- Location
- Covington, Kentucky, United States of America
- Updated
- 22 Jul 2026
- Source
- WCPO 9 News
ConstructChat
Ask ConstructChat about 4th Street Bridge Replacement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The 4th Street Bridge replacement project is in the final design phase with plans expected by December. Construction is scheduled to start in January, which will include demolition of the existing bridge. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | Kentucky |
City | Covington |
Source
Source | WCPO 9 News |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Bridge, Government |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States
- Fort Hood Military Base, Texas
- Grand Forks Air Force Base, North Dakota
- Ellsworth Air Force Base (IATA: RCA), South Dakota
- Shaw Air Force Base
- Beaumont Refinery Expansion, Texas
- Dakota Prairie Refinery, Stark County, North Dakota
- Monkey Island LNG Terminal, Louisiana
- Bayou Bridge Pipeline Project, Louisiana
