4th/88th Water Main Replacement
Pre-design · Washington · Last reported Jul 2025
Source: Dodge
At the 4th Street location, the existing water main was installed and consists of cast iron pipe, therefore replacement is recommended. The water main improvements will be included in the design and construction for the interchange project. 4th St/East of I-5 to 6300 blk/33rd Ave, 88th St/ 3500-3600 blk City of Marysville maybe seeking Design for At the 4th Street location, the existing water main
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Road, Metal, Commercial, Government, Steel
- Location
- Marysville, Washington, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 4th/88th Water Main Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | At the 4th Street location, the existing water main was installed and consists of cast iron pipe, therefore replacement is recommended. The water main improvements will be included in the design and construction for the interchange project. 4th St/East of I-5 to 6300 blk/33rd Ave, 88th St/ 3500-3600 blk City of Marysville maybe seeking Design for At the 4th Street location, the existing water main was installed and consists of cast iron pipe, therefore replacement is recommended. The water ma... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Marysville |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Road, Metal, Commercial, Government, Steel |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
