logo

5 Avenue and 1 Street Infrastructure Improvements

Sector: Water Supply and Storage • Location: Barnwell, Alberta, Canada

Source: Dodge

Project
Closed

The main items of Work of this Contract include the following: 295m of 150mm PVC water main replacement including hydrants, valves connection to existing services. Temporary water supply. 230m of 250mm PVC sanitary main replacement including precast concrete structures. Sanitary bypass pumping. 2,800m of asphalt paving and road reconstruction. 600m of surface restoration items. The Site of the Wor

Status
Closed
Sector
Water Supply and Storage, Government, Cement, Commercial, Waste Processing and Treatment, Road
Location
Barnwell, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about 5 Avenue and 1 Street Infrastructure Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “5 Avenue and 1 Street Infrastructure Improvements” is an infrastructure initiative in the Water Supply and Storage sector, located in Barnwell, Alberta, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The main items of Work of this Contract include the following: 295m of 150mm PVC water main replacement including hydrants, valves connection to existing services. Temporary water supply. 230m of 250mm PVC sanitary main replacement including precast concrete structures. Sanitary bypass pumping. 2,800m of asphalt paving and road reconstruction. 600m of surface restoration items. The Site of the Work of this Contract is located in the Village of Barnwell, Alberta.

Procurement method

Budget

Location

Country

Canada

State

Alberta

City

Barnwell

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Cement, Commercial, Waste Processing and Treatment, Road

Article published date

2025-03-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project