5 GW Solar Cell Manufacturing Plant by Gautam Solar
The owner, status and timeline of this project. A free account opens every field.
Source: Fortune India
Gautam Solar Pvt. Ltd. is investing ₹4,000 crore to set up a 54-acre solar cell manufacturing facility in Gwalior, Madhya Pradesh. The plant will produce advanced TOPCon solar cells with a total planned capacity of 5 GW. Phase 1, with 2 GW capacity, is underway and expected to complete by June next year, followed by a 3 GW expansion in Phase 2, expected operational by June 2029.
- Status
- Under Construction
- Sector
- Solar, Manufacturing (Industrial)
- Location
- Gwalior, Madhya Pradesh, India
- Updated
- 22 Jul 2026
- Source
- Fortune India
ConstructChat
Ask ConstructChat about 5 GW Solar Cell Manufacturing Plant by Gautam Solar
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Gautam Solar Pvt. Ltd. is investing ₹4,000 crore to set up a 54-acre solar cell manufacturing facility in Gwalior, Madhya Pradesh. The plant will produce advanced TOPCon solar cells with a total planned capacity of 5 GW. Phase 1, with 2 GW capacity, is underway and expected to complete by June next year, followed by a 3 GW expansion in Phase 2, expected operational by June 2029. |
Original sector | Energy |
Budget |
Location
Country | India |
State | Madhya Pradesh |
City | Gwalior |
Source
Source | Fortune India |
URL |
More Details
Record type | Project |
Sector | Solar, Manufacturing (Industrial) |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
