logo

5-in-1 Dam Bypass Channel Project

Sector: Hydro • Location: Cedar Rapids, Iowa, United States

Source: The Gazette

Project
Planned

Project to modify the 5-in-1 dam below Interstate 380 to offer white-water and flat-water features in separate channels, alongside other amenities, delayed due to Eighth Avenue Bridge replacement construction.

Status
Prospective
Sector
Hydro, Water Supply and Storage, Road, Bridge, Government
Location
Cedar Rapids, Iowa, United States of America
Updated
22 Jul 2026
Source
The Gazette

ConstructChat

Ask ConstructChat about 5-in-1 Dam Bypass Channel Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “5-in-1 Dam Bypass Channel Project” is an infrastructure initiative in the Hydro sector, located in Cedar Rapids, Iowa, United States. Taiyo aggregates data on it from The Gazette.

Participants

Sponsoring Agency

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Project to modify the 5-in-1 dam below Interstate 380 to offer white-water and flat-water features in separate channels, alongside other amenities, delayed due to Eighth Avenue Bridge replacement construction.

Original sector

Infrastructure

Location

Country

United States of America (USA)

State

Iowa

City

Cedar Rapids

Source

Source

The Gazette

URL

More Details

Record type

Project

Sector

Hydro, Water Supply and Storage, Road, Bridge, Government

Article published date

2025-11-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project