logo
ProjectAwarded

5 MW Solar Power Project

Sector: Power Generation (CCGT) • Location: Maharashtra, India

Source: Saur Energy International

Power & Instrumentation (Gujarat) Limited has secured a work order to supply, install, test, and commission a 5 MW (AC) Solar Power Project in Latur District, Maharashtra. The project is expected to be completed within 18 months, with 75% of the work to be done in the first 12 months.

Status
Closed
Sector
Power Generation (CCGT), Solar
Location
Maharashtra, India
Updated
22 Jul 2026
Source
Saur Energy International

ConstructChat

Ask ConstructChat about 5 MW Solar Power Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “5 MW Solar Power Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Maharashtra, India. Taiyo aggregates data on it from Saur Energy International.

Participants

Not available for this record.

Status

Original status

Awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Power & Instrumentation (Gujarat) Limited has secured a work order to supply, install, test, and commission a 5 MW (AC) Solar Power Project in Latur District, Maharashtra. The project is expected to be completed within 18 months, with 75% of the work to be done in the first 12 months.

Budget

Location

Country

India

State

Maharashtra

Source

Source

Saur Energy International

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Solar

Article published date

2025-01-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project