5 MW/500 MWh Energy Storage System
Start · California · Last reported Nov 2024
Source: Dodge USA
Plans to build a demonstration 5-MW/500-MW-per-hour iron-air battery facility at a Pacific Gas and Electric Co. substation in Mendocino County that can continuously discharge to the grid for 100 hours.
- Status
- Prospective
- Sector
- Commercial, Raw Materials, Energy Storage, Power Generation (CCGT), Metal, Consumer Products, Steel
- Location
- Mendocino, California, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 5 MW/500 MWh Energy Storage System
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Plans to build a demonstration 5-MW/500-MW-per-hour iron-air battery facility at a Pacific Gas and Electric Co. substation in Mendocino County that can continuously discharge to the grid for 100 hours. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Mendocino |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Raw Materials, Energy Storage, Power Generation (CCGT), Metal, Consumer Products, Steel |
Article published date | 2024-11-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
