logo

50 MW Open Access Solar Project in Bemetara

Sector: Solar • Location: Bemetara, Chhattisgarh, India

Source: Mercomindia.com

Project
Completed

AMPIN Energy Transition has commissioned a 50 MW open access solar power project in Chhattisgarh’s Bemetara district supplying renewable energy to Texmaco Rail and Engineering. The project generates around 78.21 million units of electricity annually, replacing over 80% of conventional grid consumption with clean energy and delivering 30% to 40% savings compared to retail power tariffs. Completed i

Status
Closed
Sector
Solar, Rail, Power Generation (CCGT)
Location
Bemetara, Chhattisgarh, India
Updated
22 Jul 2026
Source
Mercomindia.com

ConstructChat

Ask ConstructChat about 50 MW Open Access Solar Project in Bemetara

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “50 MW Open Access Solar Project in Bemetara” is an infrastructure initiative in the Solar sector, located in Bemetara, Chhattisgarh, India. Taiyo aggregates data on it from Mercomindia.com.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

AMPIN Energy Transition has commissioned a 50 MW open access solar power project in Chhattisgarh’s Bemetara district supplying renewable energy to Texmaco Rail and Engineering. The project generates around 78.21 million units of electricity annually, replacing over 80% of conventional grid consumption with clean energy and delivering 30% to 40% savings compared to retail power tariffs. Completed in nine months, it is AMPIN's first venture in Chhattisgarh and strengthens its renewable portfolio in Eastern India.

Original sector

Energy

Location

Country

India

State

Chhattisgarh

City

Bemetara

Source

Source

Mercomindia.com

URL

More Details

Record type

Project

Sector

Solar, Rail, Power Generation (CCGT)

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project