logo

50 MW Solar Power Project Metering Dispute

Sector: Power Generation (CCGT) • Location: Uttar Pradesh, India

Source: Energetica India Magazine

Project
Completed

A 50 MW solar power project in Uttar Pradesh faced delays in commissioning due to unsealed 33 kV meters. The dispute involved NTPC Ltd., Prayatna Developers, and Uttar Pradesh distribution companies regarding metering responsibilities and penalties.

Status
Closed
Sector
Power Generation (CCGT), Solar
Location
Uttar Pradesh, India
Updated
22 Jul 2026
Source
Energetica India Magazine

ConstructChat

Ask ConstructChat about 50 MW Solar Power Project Metering Dispute

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “50 MW Solar Power Project Metering Dispute” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Uttar Pradesh, India. Taiyo aggregates data on it from Energetica India Magazine.

Participants

Not available for this record.

Status

Original status

Completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A 50 MW solar power project in Uttar Pradesh faced delays in commissioning due to unsealed 33 kV meters. The dispute involved NTPC Ltd., Prayatna Developers, and Uttar Pradesh distribution companies regarding metering responsibilities and penalties.

Original sector

Energy

Budget

Location

Country

India

State

Uttar Pradesh

Source

Source

Energetica India Magazine

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Solar

Article published date

2025-05-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project