50 MW Wind Power Project in Dev Bhoomi Dwarka
One of 9,044 projects Taiyo tracks in Gujarat.
Source: WindInsider
A 50 MW wind power project initially planned as a 25 MW solar and 25 MW wind hybrid project at Jam Khambhaliya pooling sub-station in Gujarat. The project source was changed to wind-only following a tender award. The project is executed by a subsidiary company, Avaada GJClean Private Limited, with land acquisition completed, contracts awarded, equipment ordered, and site mobilization underway.
- Status
- Under Construction
- Sector
- Solar, Power Generation (CCGT), Wind
- Location
- Dev Bhoomi Dwarka, Gujarat, India
- Updated
- 22 Jul 2026
- Source
- WindInsider
ConstructChat
Ask ConstructChat about 50 MW Wind Power Project in Dev Bhoomi Dwarka
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A 50 MW wind power project initially planned as a 25 MW solar and 25 MW wind hybrid project at Jam Khambhaliya pooling sub-station in Gujarat. The project source was changed to wind-only following a tender award. The project is executed by a subsidiary company, Avaada GJClean Private Limited, with land acquisition completed, contracts awarded, equipment ordered, and site mobilization underway. |
Original sector | Energy |
Location
Country | India |
State | Gujarat |
City | Dev Bhoomi Dwarka |
Source
Source | WindInsider |
URL |
More Details
Record type | Project |
Sector | Solar, Power Generation (CCGT), Wind |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
