50 MWp Open Access Solar Project in Chhattisgarh
Sector: Solar • Location: Bemetara, Chhattisgarh, India
Source: Energetica India Magazine
AMPIN Energy Transition commissioned a 50 MWp solar open access project in Village Gatapar, Bemetara district, Chhattisgarh, supplying clean energy to Texmaco Rail & Engineering. The project was completed in nine months and is expected to generate approximately 78.21 million units of green energy annually, reducing CO2 emissions by nearly 64,132 tonnes per year.
- Status
- Closed
- Sector
- Solar, Rail
- Location
- Bemetara, Chhattisgarh, India
- Updated
- 22 Jul 2026
- Source
- Energetica India Magazine
ConstructChat
Ask ConstructChat about 50 MWp Open Access Solar Project in Chhattisgarh
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | AMPIN Energy Transition commissioned a 50 MWp solar open access project in Village Gatapar, Bemetara district, Chhattisgarh, supplying clean energy to Texmaco Rail & Engineering. The project was completed in nine months and is expected to generate approximately 78.21 million units of green energy annually, reducing CO2 emissions by nearly 64,132 tonnes per year. |
Original sector | Renewable Energy |
Location
Country | India |
State | Chhattisgarh |
City | Bemetara |
Source
Source | Energetica India Magazine |
URL |
More Details
Record type | Project |
Sector | Solar, Rail |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
