logo

500 MW Solar Project in Maun, Botswana

Sector: Solar • Location: Maun, Botswana

Source: pv magazine International

Project
Planned

Oman's Naqaa Sustainable Energy LLC will design, finance, construct, and operate a 500 MW solar project with battery storage in Maun, northwestern Botswana. The project is expected to have a minimum operational life of 25 years and aims to contribute to Botswana's renewable energy targets.

Status
Prospective
Sector
Solar, Power Generation (CCGT), Energy Storage
Location
Maun, Botswana
Updated
22 Jul 2026
Source
pv magazine International

ConstructChat

Ask ConstructChat about 500 MW Solar Project in Maun, Botswana

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “500 MW Solar Project in Maun, Botswana” is an infrastructure initiative in the Solar sector, located in Maun, Botswana. Taiyo aggregates data on it from pv magazine International.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Oman's Naqaa Sustainable Energy LLC will design, finance, construct, and operate a 500 MW solar project with battery storage in Maun, northwestern Botswana. The project is expected to have a minimum operational life of 25 years and aims to contribute to Botswana's renewable energy targets.

Original sector

Energy

Location

Country

Botswana

City

Maun

Source

Source

pv magazine International

URL

More Details

Record type

Project

Sector

Solar, Power Generation (CCGT), Energy Storage

Article published date

2026-04-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project