500 MW Solar Project
The status, timeline and source of this project. A free account opens every field.
Source: Saur Energy International
The Solar Energy Corporation of India (SECI) has issued a tender for a 500 MW ISTS-connected solar project. Bids are invited until March 17, 2025, for soft copies and March 19, 2025, for hard copies. The project specifies a minimum capacity of 50 MW and a maximum of 250 MW, with criteria for energy supply and generation maintenance over a 25-year period.
- Status
- Prospective
- Sector
- Solar
- Location
- India
- Updated
- 22 Jul 2026
- Source
- Saur Energy International
ConstructChat
Ask ConstructChat about 500 MW Solar Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Solar Energy Corporation of India (SECI) has issued a tender for a 500 MW ISTS-connected solar project. Bids are invited until March 17, 2025, for soft copies and March 19, 2025, for hard copies. The project specifies a minimum capacity of 50 MW and a maximum of 250 MW, with criteria for energy supply and generation maintenance over a 25-year period. |
Original sector | Renewable Energy |
Location
Country | India |
Source
Source | Saur Energy International |
URL |
More Details
Record type | Project |
Sector | Solar |
Article published date | 2025-02-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
