500MW Ibri III Solar Project
Sector: Solar • Location: Oman
Source: ZAWYA
The 500MW Ibri III Solar IPP is being developed by a consortium of major utility companies including Masdar, Acwa Power, EDF Renewables, and Sembcorp Utilities. The project is set to be located alongside the existing 500MW Ibri II project in Al Dhahirah governorate, with an investment of $401 million. It aims to contribute to Oman's renewable energy targets as part of the Oman Vision 2040 initiati
- Status
- Prospective
- Sector
- Solar, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Warehouse
- Location
- Oman
- Updated
- 22 Jul 2026
- Source
- ZAWYA
ConstructChat
Ask ConstructChat about 500MW Ibri III Solar Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The 500MW Ibri III Solar IPP is being developed by a consortium of major utility companies including Masdar, Acwa Power, EDF Renewables, and Sembcorp Utilities. The project is set to be located alongside the existing 500MW Ibri II project in Al Dhahirah governorate, with an investment of $401 million. It aims to contribute to Oman's renewable energy targets as part of the Oman Vision 2040 initiative. |
Original sector | Energy |
Budget |
Location
Country | Oman |
Source
Source | ZAWYA |
URL |
More Details
Record type | Project |
Sector | Solar, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Warehouse |
Article published date | 2025-02-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
