logo
ProjectUnder Construction

500MW Kikot-Mbebe Hydroelectric Development Project

One of 1,622 projects Taiyo tracks in Cameroon.

Source: Green Building Africa

The Kikot-Mbebe Hydroelectric Development Project involves the design, development, construction, and operation of a hydroelectric facility on the Sanaga River in Cameroon with an installed capacity of 500 MW. The project includes a 35-meter-high and 1,400-meter-long reservoir dam, a power plant with 6 turbines, and a 40 km long 400-kilovolt extra-high-voltage transmission line connecting the powe

Status
Under Construction
Sector
Water Supply and Storage, Power Transmission, Power Generation (CCGT), Hydro, Commercial, Government
Location
Cameroon
Updated
22 Jul 2026
Source
Green Building Africa

ConstructChat

Ask ConstructChat about 500MW Kikot-Mbebe Hydroelectric Development Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “500MW Kikot-Mbebe Hydroelectric Development Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Cameroon. Taiyo aggregates data on it from Green Building Africa.

Participants

Sponsoring Agency

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Kikot-Mbebe Hydroelectric Development Project involves the design, development, construction, and operation of a hydroelectric facility on the Sanaga River in Cameroon with an installed capacity of 500 MW. The project includes a 35-meter-high and 1,400-meter-long reservoir dam, a power plant with 6 turbines, and a 40 km long 400-kilovolt extra-high-voltage transmission line connecting the power plants to the RIS connection point in Boumnyebel. The project emphasizes social compliance and environmental and social impact management, including local development, livelihood restoration, and resettlement of affected persons.

Original sector

Energy

Location

Country

Cameroon

Source

Source

Green Building Africa

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Transmission, Power Generation (CCGT), Hydro, Commercial, Government

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project