50MW Data Center Development in Slough
The owner, status and timeline of this project. A free account opens every field.
Source: BeBeez International
Segro has signed a pre-lease agreement to develop a powered shell data center for an existing customer on the Slough Trading Estate. The three-story building will provide 30,000 sqm of data center space and 50MW of utility power. Planning permission is in place via the Slough Trading Estate Simplified Planning Zone.
- Status
- Prospective
- Sector
- Power Transmission, Power Generation (CCGT), Data Center, Commercial, Residential
- Location
- Slough, England, United Kingdom
- Updated
- 19 Nov 2026
- Source
- BeBeez International
ConstructChat
Ask ConstructChat about 50MW Data Center Development in Slough
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Segro has signed a pre-lease agreement to develop a powered shell data center for an existing customer on the Slough Trading Estate. The three-story building will provide 30,000 sqm of data center space and 50MW of utility power. Planning permission is in place via the Slough Trading Estate Simplified Planning Zone. |
Original sector | Real Estate |
Location
Country | United Kingdom (UK) |
State | England |
City | Slough |
Source
Source | BeBeez International |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Power Generation (CCGT), Data Center, Commercial, Residential |
Article published date | 2026-03-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United Kingdom
- Coryton Refinery
- Gas to the West Project
- River Humber Gas Pipeline Replacement Project, North Lincolnshire
- London Cycle Superhighways
- A556 Knutsford-Bowdon Improvement Project
- Nestle Ski Yoghurt Line Expansion, Cuddington, Cheshire
- Piramal’s ADC Manufacturing Facility Expansion, Grangemouth, Scotland
- M80 Stepps to Haggs Upgrade Project
