50MW Solar Plant on Former Lignite Mining Site in Saxony-Anhalt
The owner, status and timeline of this project. A free account opens every field.
Source: PFIE
RP Global has secured bridge financing through BayernLB to fund its 50MW solar plant on a former lignite mining site in Saxony-Anhalt, Germany. MaxSolar is the EPC contractor, and the project is expected to expand by 15MW after grid line reinforcement. Commissioning is set for September, with construction underway on a substation and panels installed.
- Status
- Under Construction
- Sector
- Solar, Bridge
- Location
- Saxony-Anhalt, Germany
- Updated
- 22 Jul 2026
- Source
- PFIE
ConstructChat
Ask ConstructChat about 50MW Solar Plant on Former Lignite Mining Site in Saxony-Anhalt
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | RP Global has secured bridge financing through BayernLB to fund its 50MW solar plant on a former lignite mining site in Saxony-Anhalt, Germany. MaxSolar is the EPC contractor, and the project is expected to expand by 15MW after grid line reinforcement. Commissioning is set for September, with construction underway on a substation and panels installed. |
Original sector | Energy |
Location
Country | Germany |
State | Saxony-Anhalt |
Source
Source | PFIE |
URL |
More Details
Record type | Project |
Sector | Solar, Bridge |
Article published date | 2026-05-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
