516 Coleman Boulevard Parking Lot Construction
Sector: Electric Vehicles (EVs) • Location: Mount Pleasant, South Carolina, United States of America
Source: Dodge
The Town of Mount Pleasant has elected to pursue a contract for improvements at 516 Coleman Blvd to construct a parking lot. The work will consist of, but not limited to, construction of concrete sidewalk and curb, underground detention system, installation of (2) two EV Charging Stations, Omni Flow lighting systems consisting of 7 26 poles with the 07 Omni-Flow head (approximately 4 in diameter)
- Status
- Closed
- Sector
- Electric Vehicles (EVs), Power Generation (CCGT), Automotive, Cement, Road, Government, Car parking, Commercial
- Location
- Mount Pleasant, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 516 Coleman Boulevard Parking Lot Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Town of Mount Pleasant has elected to pursue a contract for improvements at 516 Coleman Blvd to construct a parking lot. The work will consist of, but not limited to, construction of concrete sidewalk and curb, underground detention system, installation of (2) two EV Charging Stations, Omni Flow lighting systems consisting of 7 26 poles with the 07 Omni-Flow head (approximately 4 in diameter) using 15 LED lights, asphalt paving, grass pavers, tree planting and relocation per ANSI A300 par... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Mount Pleasant |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Electric Vehicles (EVs), Power Generation (CCGT), Automotive, Cement, Road, Government, Car parking, Commercial |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Electric Vehicles (EVs) projects in United States of America
- PV SOLAR ROOF MOUNT SYSTEM: (15) 400W MODULES AT 6 KW TOTAL. INSTALL EV CHARGER.
- MGM Tobacco Certificate of Nonconforming Use
- Tasman East - 5123 Calle Del Sol (Ensemble)
- The College of Southern Nevada's CONNECTIVITY CONCIERGES
- Construction of a manufacturing facility for electric vehicle batteries for Panasonic Energy in De Soto, Kansas (United States)
- MAYFIELD TO JEWEL ROAD
- FY2008 Discretionary Grants for the Family Violence Prevention and Services Program
- 122402 MILLS AVE NE Citywide Alley Restoration
